The staff performing this activity must be integrated into the team.
Testing must occur throughout the process and throughout each iteration. It is not some final inspection to be done at the end. As requirements are de veloped and integrated into the build they should be tested as soon as possible.
This program and the accompanying materials are made available under the Eclipse Public License v1.0 which accompanies this distribution.
OpenUP Copyright.
OpenUP/DSDM Copyright.